Instrument Engineering Lead, SSAGS Project (Shell)
Work in a consolidate team for the envelope of the project. P&ID revision mark-up, mechanization in SPI at every P&ID revision. Instrument Index and data sheet index for all implant. Follow up and mark-up of all vendors’s document for all package units, according to instrument department. Survey on site on the brown field part of implant, to be in a position to remove all actual instrumentation and issue the appropriate data sheet to buy the new one. Create reports of activity; coordinate a group of Nigerians and Indians employers.
Technical bid evaluation for all process Instruments, both on Green field than in Brown field.
About the project (value around 800 milion USD)
The southern Swamp area comprises 16 fields, of whch 12 are currently producing. The fields lie in the coastal swamp area, 65km south of Warri, with 100 oil wells and flow lines currently producing through four flow stations (Benisede, opukushi, Ogbotobo and Tunu). A new field logistics base at Tunu is close to completion. Oil is transported via the Trans Ramos pipeline to the Forcados terminal. Under the SSAGS project, gas will be exported to Escravos Lagos Pipelin System (ELPS) via the existing pipelines and a new pipelin that will be installed. Contracts for production facilities and gathering pipelines were awarded to Saipem Contracting Nigeria Ltd and to Daewoo Nigeria Ltd.